Case study

this assignment is related to assignment 2
i will upload assignment 2 with the correct calculation
Please avoid plagiarism
please do all the requirements in the scope of work one by one

I want an engineering writer to do this .
please reply

Students will prepare and deliver a road construction tender document for pavement construction up to sealing, including estimations of material volumes,drainage design, and whole of life performance